| 4000A High Current Generator |
Dray Electric recommends for you
STDL-10000B High Current Generator (referred to as current booster), a test equipment independently developed by our company, integrates the advantages of similar products at home and abroad, adopts numerical control technology, strong anti-interference ability, compared with the previous generation of current booster, due to the use of low power consumption, large capacity auto-transformer and high permeability iron core made of current transformer, it has the advantages of large output power, small size, light weight, etc. Mainly used for primary bus protection and various current transformer ratio and other test items, widely used in electric power, railway, petrochemical, metallurgy and mining enterprises in scientific research, production and electrical test sites.
1. Overview
STDL-20000B High Current Generator (referred to as current booster), a test equipment independently developed by our company, integrates the advantages of similar products at home and abroad, adopts numerical control technology, strong anti-interference ability, compared with the previous generation of current booster, due to the use of low power consumption, large capacity auto-transformer and high permeability iron core made of current transformer, it has the advantages of large output power, small size, light weight, etc. Mainly used for primary bus protection and various current transformer ratio and other test items, widely used in electric power, railway, petrochemical, metallurgy and mining enterprises in scientific research, production and electrical test sites.
2. Performance characteristics,
◆ Adopt beautiful and generous PVC panel
◆ Directly display the test values of primary current and secondary current, convenient for test observation and recording.
◆ High measurement accuracy 0.2 level
◆ Large power, small size, strong load capacity
◆ Small size, light weight, volume only 30% to 70% of similar products, very convenient to carry.
4.STDL-20000B High Current Generator operation aspects
(1) After wiring, check once to see if there are any wiring errors and whether the connectors are in good contact.
(2) During the test, if there is arcing, or no display at startup and other abnormal phenomena, immediately turn off the power and recheck the wiring.
(3) In actual wiring, the current output terminal should form a loop, otherwise the instrument will not output current.
(4) This current booster comes with random output wires; external copper wires should be selected according to 10A/mm2. (Standard configuration is two 3-meter test leads)
(5) The equipment capacity is designed for 5-minute short-time work. If used for batch testing, the working time should be less than 2.5 minutes, wait 10 minutes before the next work. For temperature rise (30 minutes to 24 hours), it should be configured according to long-term working temperature rise.

Note: The above information and technical parameters are compiled and released by Yangzhou Dray Electric Co., Ltd.