Product Description









360V/5KA/150HZ Withstand Voltage Test Parameters


Darui Electric recommends



1. Input voltage: Three-phase 380V 50HZ



2. Output voltage: Single-phase 0~300V/0~500V/0~1000V (continuously adjustable), frequency: 150HZ

3. Output capacity: 0~1000kvA, harmonic distortion: <1%

4. No-load operation time: ≤5 minutes 

5. Duration of tested object at rated voltage: 40 seconds

6. Load characteristics: resistive, inductive, capacitive all acceptable



Product aliases:



Triple frequency generator, induced voltage triple frequency generator, triple frequency power supply generator, test triple frequency transformer device, triple frequency induced withstand voltage generator, triple frequency test transformer, triple frequency tester, triple frequency induced withstand voltage tester, voltage transformer frequency multiplier AC withstand voltage test



After-sales service commitment:



1. Service purpose: quick response, proper handling, thoughtful service.

2. Service goal: customer satisfaction is our goal.

3. Service efficiency: if equipment fails during or after warranty period, after receiving notification, maintenance personnel will arrive at the site within 12 hours and begin repairs.

4. Service principle: the product has a one-year free warranty period. During the warranty period, the supplier will repair or replace parts damaged due to quality issues for free. For parts damaged outside the warranty period, only the cost of parts will be charged. For equipment damage caused by user factors, the supplier will charge at cost for repairs or replacement parts.



Triple Frequency Induced Withstand Voltage Test Device5kva/360v/150hz



Precautions:



1. This equipment is designed for short-term operation, so it is not allowed to operate at rated capacity for extended periods, especially not exceeding the rated current, to prevent overheating.



2. For newly installed or long-unused transformers, before operation, use a 1500 megohmmeter to measure the insulation resistance between coils and between coils and ground. Only use when the resistance value is not less than 0.5 megohms.



3. During use, the current-increasing transformer and the operation console must be reliably grounded to ensure safety.



4. When increasing current, do so slowly and evenly; avoid excessive vibration during handling.



5. Keep the contact surface between the voltage regulator and the brush clean. If necessary, wipe it with cotton yarn dipped in 90% alcohol.







Note: The above information and technical parameters are compiled and released by Yangzhou Darui Electric Co., Ltd.



 


WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio Tester、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us