Product Features


Used to measure the insulation performance of insulating flanges with cathodic protection, it can directly display the final result of the measured insulating joint, such as short circuit, short circuit, or good. On-site testing requires no calibration or operation, and it can determine whether the insulating joint has failed within 30 seconds.

Detailed Introduction


CE-IT Buried Pipeline Insulating Flange Tester

 Used to measure the insulation performance of insulating flanges with cathodic protection, it can directly display the final result of the measured insulating joint, such as short circuit, short circuit, or good. On-site testing requires no calibration or operation, and it can determine whether the insulating joint has failed within 30 seconds.

 

This device is used to measure the insulation performance of insulating flanges with cathodic protection, and it can directly display the final result of the measured insulating joint, such as short circuit, short circuit, or good. On-site testing requires no calibration or operation, and it can determine whether the insulating joint has failed within 30 seconds.

Introduction to the CE/IT Buried Pipeline Insulating Flange Tester

The CE-IT Buried Pipeline Insulating Flange (Insulating Joint) Tester from Tinker & Rasor Company in the United States was developed by the American Tinker & Rasor Company (referred to as TR Company) for quickly testing the insulation performance of insulating flanges and insulating joints on buried pipelines. The CE-IT Underground Pipeline Insulator Performance Tester is a fully automatic, highly sensitive electronic device used to test the effectiveness of buried pipeline insulators, and it can also be used to determine the isolation status of road crossing casings.

 The Model CE-IT Insulator Tester is fully automatic and highly sensitive electronic instrument designed to test the effectiveness of buried pipeline insulators. The CE-IT can also be used to determine isolation condition of pipelines in road crossing casings.

During testing, the internal circuit of the CE-IT Buried Pipeline Insulating Joint Performance Tester can automatically adapt to the voltage polarity present on the underground pipeline system. The entire testing process is completed within 30 seconds, and the test results are displayed as readings on the LCD screen, with an audio signal to alert the operator when the test is complete. The CE-IT Buried Pipeline Insulator Performance Tester from the American Tinker & Rasor Company has been factory-calibrated and can be used directly without on-site adjustments. The RF-IT Surface Pipeline Insulating Joint Tester from the American Tinker & Rasor Company has been applied to the effectiveness testing of insulating flanges and insulating joints both domestically and internationally, becoming one of the equipment for ECDA effectiveness assessment of buried pipelines. The RF-IT Above-ground Pipeline Insulating Joint Tester, when used in conjunction with the CE-IT Buried Pipeline Insulating Flange (Insulating Joint) Tester, can solve the insulation performance testing of all flanges and joints.

Functional Features of the CE-IT Underground Insulating Joint Tester

·  Quickly detect whether the insulation performance of insulating joints or insulating flanges in buried pipelines has failed;

·  Equipped with automatic shutdown function, automatically shutting down after 10 minutes of no operation;

·  Factory-calibrated, no on-site adjustments or settings required;

· Battery working time of 50 hours;

·  Efficient testing, the entire process takes only 30 seconds;

·  Detects external polarity;

·  Matches external polarity;

·  Detects external voltage;

·  Matches internal voltage corresponding to external voltage;

·  Sends charging voltage;

· Detects the current throughout the entire test cycle;

· Provides test results that take into account the above test parameters.

The circuit of the CE-IT Underground Insulating Joint Tester can automatically adjust and adapt to the voltage polarity present on the pipeline being tested, and the test results are displayed in English on the LCD screen.

"GOOD": When the CE-IT detects that the electrical load on either side of the pipeline insulator does not leak from one side to the other, the LCD screen displays "GOOD"; this means that an electrical load can be created, so it is confident that the insulator is good.

"BAD/SHORT": When the CE-IT detects that the electrical load on either side of the pipeline insulator leaks from one side to the other, the LCD screen displays "BAD/SHORT"; this means that an electrical load cannot be created, so it is confident that the insulator is ineffective.

"BAD/OPEN": When the CE-IT cannot create an electrical load on one or both sides of the insulator, the LCD screen displays "BAD/OPEN"; this result indicates that the wires on one or both sides of the pipeline insulator being tested are disconnected.

Technical Principles of the CE-IT Underground Insulating Flange Tester

The true impedance value of a buried insulator depends on many factors, such as the environment at its location. In environments with very low impedance, the impedance measurement for an insulation failure point should be below 0.5 ohms. Therefore, for the inspection of insulation failure points in buried pipelines, current leakage testing is better than built-in impedance testing. For this reason, the TR-CE-IT Buried Pipeline Insulator Performance Tester considers the electrical performance of the failure point itself, rather than its built-in impedance. Generally, the following situations may occur during insulator testing:

· In practice, different ground voltage readings can prove to be on opposite sides of the insulator; when the difference in ground voltage across the insulator is small or of opposite polarity, it indicates that it comes from the opposite side of the protected section of the pipeline.

· The current leakage allowed to flow at the contact point is 25% or lower;

· The voltage drop across the insulator is relatively significant (while the voltage drop across an ineffective or short-circuited insulator is negligible, typically 10 millivolts or lower);

The CE-IT Buried Pipeline Insulator Performance Tester uses the above three criteria to determine the condition of the insulator and the test path (for example, from the test post to both sides of the insulator): open circuit, short circuit, or good.

Features

Provides test results through digital display

Results provided

Effectiveness of buried pipe insulators

Isolation status of pipelines in road crossing casings

Good indicates broken wire

Automatic shutdown to ensure long battery life

 

Includes

Instrument

AA batteries

Connectors with leads and clips

Instruction manual

CE-IT Capabilities

Senses & Replicates: external polarity, external voltage,

Simulates, internal voltage reference with external voltage

Measures the flowing current throughout the entire test cycle

Provides test results considering the above test parameters

Battery life exceeds 50 hours  

The CE-IT can quickly and accurately test underground insulators and road crossing casings. This fully automatic unit tests insulators without requiring any adjustments by the operator.





WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio Tester、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us