Three-Frequency Test Transformer Fault Repair Steps - Yangzhou Darui



Darui Electric recommends for you



Power outage occurred in Chongming Residential Area, Dachaidan Administrative Committee, Haixi Prefecture, Qinghai Province. After receiving the repair request, Xiong Guoxi, the leader of the distribution network inspection and repair class of State Grid Dachaidan Power Supply Company, immediately organized repair personnel to rush to the scene. They split into three groups to conduct fault investigation and locate the fault point. One group inspected the transformer in the station area, another patrolled the 10kV Keqi Road, and the third group conducted interviews near the site.



  “Line inspection completed, everything is normal.”



  “Buildings 3 and 4 of Chongmin Residential Area in the 01 Oil Station area are missing a phase.”



  “It should be a problem with the power supply cables for Buildings 3 and 4.” Based on years of work experience, Xiong Guoxi immediately concluded. The repair personnel used a cable fault tester to locate the faulty cable.



  At 17:24, the repair personnel identified the fault point: due to continuous rainfall, the cable became damp and caused a short circuit. “The original cable is no longer usable. We need to change the work plan immediately and lay a new cable for power supply.” Xiong Guoxi said, “Since the cable is directly buried, we have to dig up the entire foundation to replace it.”



  “How long until the power comes back? We have guests at home tonight!”



  “Yes, we can't delay the children's studies...” Because of the power outage, residents of the community gradually gathered around the repair personnel. Everyone spoke up, making the repair team feel even more urgency to speed up the repair.



  “Everyone, please go back. We promise to repair it as quickly as possible. We apologize for the inconvenience.” Xiong Guoxi explained to the residents.



  In order to minimize the power outage time and quickly restore power supply, the repair personnel each performed their own duties and engaged in the emergency repair in an orderly but busy manner. Those responsible for the site started digging trenches, those responsible for materials returned to the company to find cables of the same model. Once everything was ready, they skillfully began making cable joints, squatting or standing for an hour or so.



  As night fell, the onlookers had long dispersed. Under the emergency lighting, the repair personnel were busy repairing the damaged cable, stripping the sheath, cleaning, installing copper tubes, crimping, applying insulation layers, baking, debugging... During the repair process, each repair personnel maintained a high level of concentration, carefully executing every production instruction. No one complained of fatigue or hardship... until the withstand voltage test was completed.



 



1-201015145046349.jpg



 



Note: The above information and technical parameters are compiled and released by Yangzhou Darui Electric Co., Ltd.